  • 7.5

    m/s

  • 528

    MW

  • 1,400

    GWh/yr

  • Consortium

    JNDC-KWC-KHNP-HEC

  • Location

    Anmado, Yeongwang-gun, Jeolanam-do West sea

  • Size

    92Km2

  • Depth

    15m~25m

  • Soil

    Sand/Silt

  • Capacity

    528MW

  • Construction period

    2022.1Q ~ 2024. 4Q (36months)

  • Total cost

    2.7 billion

  • Anual Energy Production

    1,400 GWh/yr

EBL aproved (2019.04) for phaseⅠ
EBL aproved(2020.07) for pahseⅡ

JNDC
  • Equity Investment
  • Deal with government
  • Resident support
  • Wind measurement
KWC
  • Equity Investment
  • EBL
  • Government Permission
  • Resident consent
HEC
  • Equity Investment
  • EPC
  • Pre-feasibilty study
  • Government Permission sup.
KHNP
  • Equity Investment
  • REC purchase
  • Grid connection